《新唐书·李密传》,求翻译,急急急!!!
Job title: information engineer Time: 2007.5 2011.5 Ningbo city The nature of the work: full-time Professional category: network system engineer Job duties: setting management company of domain environment, mail server, the isa server, clustered servers, and maintain the SQL database servers and liunx server, set up and manage company's pix, switch, etc, are equipment (cisco, the sharpness, huawei).Project experience:Project name: moss system online Server: Windows server 2003, SQL server 2005, Microsoft Office Sharepoint server 2007,The client environment: Windows xp to sound, office 2007 Start date: August 2008 completion date of September 2008 Description: this project is realized for the company preliminary paper words office, and make it become part of the e words Responsibility: installation, setting, and described the design, this system maintenance Project name: network adjustment The network equipment and hardware environment: cisco pix 515 2600 RG6800 cisco are (layer 3 switches) cisco 2960 Server: Windows Server 2003 domain, documents, printing, proxy Server The client environment: Windows xp to sound Start date: April 2009 completion date: May 2009 Description: the project for the company to transform network environment. The network use structured cabling, use industry standard design, use file, agent, to print the server build new production and office network system Description: participate in network responsibility, responsible for field service module, routing exchange configuration, design, design, VLAN VTP STP design, TRUNK, ETHERCHANNEL design, design OSPF area, Internet access design, network security design, system fault switch mechanism (HSRP, STP, routing switch) Project name: card system The network equipment and hardware environment: the access layer Catalyst2950 C2960G convergence layer Server: Windows Server 2003 domain servers The client environment: attendance machine, entrance guard machine, consumer machines Start date: 2009 years on the completion date: 2009 years on Project description: the project company establish entrance guard, attendance and consumption card system, etc Module description: the equipment selection model, set the switch VLAN, STP, TRUNK. Door machine, attendance machine and consumption levels of installation. Of the smart card system installation, debugging and maintenance. Make it become a safe and efficient card system. The network facilities efficiency and security and can be expanded.Description: participate in network responsibility, participate in equipment installation debugging.Project name: exchange server migration Server: Windows Server 2003 domain servers, exchange Server 2003, exchange Server 2007, HP360G5 Server, HP580G5 Server.Start date: October 2010 completion date: October 2010 Project description: the project in order to improve the company's E-mail system work efficiency, and will mail the hardware environment from the low end to high-end servers server mobile, and the software environment from the exchange server 2003 upgrade to the exchange server 2007.Responsibility description: leading planning, and implementation and follow-up testing maintenance.Job duties: through the *** function implement automatically change the remote monitoring equipment Project experience:Project name: China vanke new city pump room monitoring Implement time: 2011.6-2011.6 The network equipment and hardware environment: the server use H3C-F100-S firewall, the client to use H3C F-100-C and C2000 N2S1 / N2A1 TCP/IP converter, support of TCP/IP network video camera.Software environment: WINDOWS XP system, SQL SERVER 2005 Project description: leaders hope that can 24 hours continuous monitoring of the fulcrum scattered in automation equipment and the working conditions of the camera, but also to ensure the secret data headquarters. So I hope I can get through technology to help solve the problem. Through the communication with our clients, confirm the final plan. Can H3C IPSEC *** tunnel through-the encryption technology Responsibility description: leading planning, and implementation and follow-up testing maintenance.
转载请注明出处51数据库 » hp network automatio
hello--你的钱掉了